A hospital in Broward Ward County Florida was having a new chiller unit installed as part of a new expansion. The original piping specification was for a low end alkyd primer with an acrylic finish.The contractor wanted upgrade the quality of the system to offer a better long-term performance characteristics on the pipes. Due to the surface preparation constraints (the pipes came to the site on prime and sandblasting was not an option), a system with surface tolerance primer was required that could be applied over an SS PC– SP three power tool clean surface.